The George Washington Carver Center in Peoria, Il had to have 800 sq ft of new hard maple floor added to the existing gym to increase the size of the overall gym floor. Multiple areas in the existing floor then had to be repaired with new maple flooring. Once the floor was finished be repaired we then sanded the whole gym floor, add new game lines and refinished the whole gym. The existing thresholds from the old gym had to be stripped of paint and then were re-installed.